Visuelle Assistenzsoftware öffnen. Mit der Tastatur erreichbar über ALT + 1 - Eye-Able Logo

Our flagship headquarters

© Astrid Knie

Energy-plus company

headquarters

Our Windkraft headquarters building is the multi award-winning architectural embodiment of our corporate philosophy. Built in 2014, the building was the first energy-plus building in Lower Austria – eco-friendly, sustainable and energy-efficient. However, due to our rapid growth in recent years, we’ve now reached full capacity. To accommodate our ever-growing business, a forward-looking expansion of the office building is currently in the works. The project is being supervised by a representative team of building users consisting of employees from various departments working together with Juri Troy Architects and M.O.O.CON.

Pioneering eco-friendly project

An eco-friendly wooden frame with clay walls and an interior courtyard will expand the existing office space while simultaneously creating a new building. With this project, we are setting new standards for innovative, sustainable and environmentally friendly construction in harmony with the local landscape and nature. Particular attention has been given to offering flexible workspaces and an inspiring workplace to foster the creativity and motivation of our team. Construction began in 2023 and is scheduled for completion in 2024.

E-moblity powered by solar energy

Solar power fuels our e-fleet

 

As pioneers in sustainable corporate governance, we have made our entire fleet of company vehicles fully electric – with the one exception of service vehicles. Each vehicle is charged using climate-friendly solar energy produced by our in-house photovoltaic system with connected battery storage. The system provides the stored solar energy as required for powering the office or charging our e-vehicles first thing in the morning.

Full electrification planned by 2026

We started using an electric service vehicle back in 2023.  However, by 2026, we plan to have a fully electric vehicle fleet. As part of the expansion of our office building, the current charging infrastructure will be extended, new parking spaces equipped with chargers added and a hypercharger installed.